Roof ground clearance.
Cedar siding installation tips.
Type of recommended finish coat priming coat.
Eastern white cedar shingles before installing your maibec shingles carefully read the installation guide completely to understand the correct steps and precautions to take to ensure.
Natural and semi coat all surfaces with the stain transparent stains solid color stains coat all surfaces with an and paints alkyd oil stain blocking primer.
Also placing spacers between the slats will help to ensure a straight piece of siding.
Place nail just above the overlap.
It is best that the siding slats be kept six to 12 inches off the ground so that the exposure to water is limited.
How to install cedar bevel siding 1.
Damp siding should be allowed to acclimatize from three to five days dry knotty cedar siding for 7 to 10 days and green siding for a minimum of 30 days.
Most wood expansion and contraction is across the width of the board.
Wrap the house with a polyethylene or similar moisture barrier stapled to the wooden wall sheathing with a.
Movement length wise is minimal.
Do not reduce the siding overlap recommendations given in the installation sections of this publication.
Air or kiln dried siding that has been kept dry can be installed immediately.
Cedar is a material that needs to be allowed to flex once installed.
For optimal performance and appearance and to benefit from all the advantages the maibec warranty has to offer maibec siding must be installed with great care.
Install corner trim on all corners typically 1 by 4 inch boards nailed vertically with the wide face of a board.
Recommended priming procedures for cedar siding.
Fasten a cedar starter strip.
Hot dipped galvanized aluminum and stainless steel nails are all corrosion resistant and can be.
Ensuring that the moisture content of cedar siding is at equilibrium before it is installed will minimize movement later on.
Door and window flashing.
The cedar siding is first acclimatized by storing on stickers.
Cedar siding can swell or shrink as it gains or loses moisture to reach equilibrium with the moisture content of the surrounding air.
Western red cedar siding pre installation tips recommended fasteners.
Bevel siding should be face nailed to studs with 1 1 4 inch penetration into solid wood using one nail per piece spaced at a maximum of 24 inches on center.
Take care not to nail through the overlap of two pieces.
Like all siding materials western red cedar performs best when installed properly on a suitable.
Selection of a lap siding pattern minimizes the affect of that movement.
But to minimize gaps take the time to miter angle cut and treat the ends as you install and the results will last for years.